REAL WORLD CONSTRUCTION
We are intent to build a 'dome'. We choose 1V model as our 'dome'. Our intention is clearly shown by our motto which is ‘ No Pain No Gain’. If we are not able or willing to face any obstacles such as limited time and others, we will never success to finish and gain our product which is a 'dome'. We intent to build the 'dome' that we can stay in it for about 12 months.
KNOWLEDGE :

ZUHAIRI JOHAR BIN SAEDIN ( PLANNING)
ZAINAB BT HAMZAH ( INTERIOR DESIGN)
NOOR ASHIDAH BT YUSOF (CONSTRUCTION MANAGEMENT)
FARAH HANIN BT MOHD NAIN (PLANNING)
NOR'ATIKAH BT ISMAIL (BUILDING TECHNOLOGY)
MOTTO : NO PAIN NO GAIN


Team at least ONE from a different major.
Team Leaders, please submit the particulars of your team in theLifespan: Not more than 12 months.
Links: Not linked to other domes, i.e. independent, standalone.
Team Report:
Each team must submit a report illustrating all the above rules including the lifespan of the proposed dome and what the materials can be recycled into.
Report (210mmX210mm) must be bound with a front and back covers.
The front cover must carry the team name, the members and majors, motto, and a sketch of the proposed dome.
Submission: 10:00am, 10 September, E48A.
Suitable bamboos are chosen...
First of all, we cut down the bamboos. Then, we cut the bamboos into pieces due to the size, 2 meter
We started to stand the body of the dome first and followed by the roof.
by jointed up the bamboos by tight it using the ropes.
At last, We covered the dome by plastics.It is important to us to cover the roof with plastics first before joint it up to the body of the dome because we will face a problem to cover the roof if the roof already on the top as the roof is quite high to us.

PRODUCT : A NONGEODESIC DOME
THE PRODUCTION ON VARIOUS SCALE:-
OBJECT:
Intention:Produce tools and material that needed in producing a dome
Act: process the suitable components
Actor:Object designer
Rule:Size and quantity
Site:Working room
Product: Object
INTERIOR:
Intention:design dome
Act:Design the model as agreed from all the members involved,,,not only from one designer
Product:model of the production
Actor:All the group members
Rule:Geodesic dome
Site:building
BUILDING:
Intention:Build a dome
Act:Work by following steps based on the model and rule
Product:A dome
Actor:All the group members
Rule:The gravity of the dome
Site:An empty land
PREMISE:
Intention:Produce in a strategic area with facilities
Act:Decorate the environment
Product:A beautiful environment
Actor:Members of the group interact with others
Rule:Environment friendly
Site:The surrounding dome
URBAN:
Intention:Produce a suitable area
Act:Design according to demand of the dean
Product:An open area
Actor:All the members interact with others from different school
Rule:Environment friendly
Site:HBP
REGIONAL:
NOT APPLICABLE
GLOBAL:
Only when the production is documented and available online
The geodesic dome as aproduct may contribute to the change in the bilt environment on different scales
1 comments:
Greetings from Italy, good luck
Marlow
Post a Comment